ICC Meetings Minutes 2008

LHC Homepage

     

 
Meeting No. Date Main Topics
2008-10 29-AUG-08 Hardware Baseline: Engineering change control/Engineering specs -  Hardware commissioning: Status of the cool down - Results of the power tests - Results from the latest injection test - Planning to September 10th - Objectives for September 10th.
2008-09 01-AUG-08

General Information - Hardware Baseline: Engineering change control/Engineering specs - Electrical infrastructure -   Hardware commissioning: Status of the cool down - Progress of Powering Tests - Preparation for the Injection Test - DSO tests.

2008-08 04-JUL-08

General Information - Hardware Baseline: Engineering change control/Engineering specs -  Hardware commissioning: LHC cryogenics situation - Status of ongoing power tests - Operations testing in Sector 56 - DSO tests.

2008-07 06-JUN-08

General Information - Hardware Baseline: Engineering change control/Engineering specs - Cool down of the machine -  Power tests - Training campaign of the dipole magnets.

2008-06 21-MAY-08

Status of the cooldown - Status of the power tests - Procedures for removal of material from the LHC - Plans for minimizing single events upsets in the LHC - Actions ongoing for shielding sensitive electronics - Situation with the beam dump dilution kickers of beam 2.

2008-05 9-MAY-08

General Information - Hardware Baseline: Engineering change control/Engineering specs - Tour of the Ring:  Status of cool down - Status of repairs and consolidation - Status and plans for power tests - Humidity on Sector 34.

2008-04 11-APR-08

General Information - Hardware Baseline: Engineering change control/Engineering specs - Tour of the Ring:  Status of cool down - Status of repairs and consolidation - Status and plans for power tests - Radiation issues on electronics.

2008-03 14-MAR-08

General Information - Hardware Baseline: Engineering change control/Engineering specs - Tour of the Ring:  Cryogenics situation - Consolidation activities - Preparations for powering - Summary of Sector 45 Review.

2008-02 15-FEB-08

General Information - Hardware Baseline: Engineering change control/Engineering specs - Hardware Commissioning:  LHC cryogenics situation - Status of powering tests - Consolidation work - Recent changes affecting the schedule.

2008-01 18-JAN-08

General Information - Hardware Baseline: Engineering change control/Engineering specs - Access control system reception tests - Hardware Commissioning:  LHC cryogenics situation - Power tests in Sector 4-5 - Mid-term plan.


Webmaster

Last update: 03/09/08