Meeting No. |
Date |
Main
Topics |
|
2007-11 |
14-DEC-07 |
General Information - Hardware Baseline:
Engineering change control/Engineering specs -
Assembly: The LHC arc interconnect programm
- Leaks
in Sector 8-1 - Hardware Commissioning:
Cryogenic
activities around the machine -
Power tests -
RF system start-up - Alignment of LHCb and ALICE
compensator magnets - Update on the progress. |
|
2007-10 |
16-NOV-07 |
General Information - Hardware Baseline:
Engineering change control/Engineering specs -
Assembly:
Bellows
of the SSS level gauges in Sector 1-2
- Leaks
in Sector 7-8 - Hardware Commissioning:
Cryogenic
activities around the machine -
Radiation issues during CNGS operation - Correlation with
simulations - Update on the progress. |
|
2007-09 |
19-OCT-07 |
General Information - Hardware Baseline:
Engineering change control/Engineering specs -
Assembly:
Status
of Sector 78 status - Status of Sector
81 exchange of SSS, leak tests - Hardware Commissioning:
Status
of Sector 45 cool down - Status of Sector 56 preparation for
flushing - Status of Sector 67 preparation for pressure test - Update on DSLC
installation - Update on water-cooled cables - Update PIMs
- Update on the progress
- Cooling of the thermal
screens in Sector 12 - Situation with the TI2 beam tests. |
|
2007-08 |
21-SEP-07 |
General information -
Hardware baseline: Engineering change control/Engineering
specs
- Hardware commissioning: Sector 4-5 - Sector 7-8
- Sector 8-1 - Situation with the Plug in Modules - Progress
and Master Schedule. |
|
2007-07 |
17-AUG-07 |
General information -
Hardware baseline: Engineering change control/Engineering
specs
- Cool down of Sector 4-5 - Inner Triplet installation and
consolidation of Sector 7-8 - Situation in Sector 8-1 -
Master Schedule and progress. |
|
2007-06 |
22-JUN-07 |
General information -
Hardware baseline: Engineering change control/Engineering
specs
- Triplet repair - Planning and installation: Status of LHC
installation - Version 4.0 of the General Coordination Schedule -
Hardware commissioning:
Status of the cryogenics in Sectors 7-8 and 4-5
- ELQA in Sector 7-8 -
Progress with powering tests in Sector 7-8. |
|
2007-05 |
25-MAY-07 |
General information -
Hardware baseline: Engineering change control/Engineering
specs
- Triplet repair - Status of Sector 4-5 - Status of the DSL - Planning and installation: Status of LHC
installation and new installation schedule -
Hardware commissioning:
Progress with cool down of Sector 7-8
- Status of the powering tests. |
|
2007-04 |
27-APR-07 |
General information -
Report from triplet
review -
Warm vacuum systems
-
Hardware baseline: Engineering change control/Engineering
specs
- Planning and installation: Status of LHC installation -
Options for commissioning Sector 4-5 -
Hardware commissioning:
Progress with cool down of Sector 7-8
- Preparation for and
progress with power tests. |
|
2007-03 |
30-MAR-07 |
General information -
Hardware commissioning:
Latest on the Triplet Magnets - Progress with cool down of
Sector 7-8 - Status of the RF systems - Status on the Injection
System and Warm Magnets at Point 8 - Progress with Electrical
Quality Assurance at cold - News - Hardware baseline: Engineering change control/Engineering specs
- Status of LHC installation. |
|
2007-02 |
02-MAR-07 |
General information -
Hardware baseline: Engineering change control/Engineering specs
- Planning
and installation: Status of installation -
Inner triplet repair - Implications for planning - Hardware
commissioning: News - Progress with cool down of Sector 7-8 -
Preparations for powering Sector 7-8 - Collimator status. |
|
2007-01 |
02-FEB-07 |
Introduction to the ICC -
Hardware baseline:
Engineering change control/Engineering specs
- Planning and installation: Status of
inner triplet repair - Status of installation -
Hardware
commissioning - Cool down of Sector 7-8. |