LHC Design Report Volume I The LHC Main Ring 1 Introduction 2 Beam Parameters and Definitions 3 Layout and Performance 4 Optics and Single Particle Dynamics 5 Collective Effects 6 RF Systems & Beam Feedback 7 Main Magnets in the Arcs 8 Insertion Magnets 9 Powering and Protection 10 Power Converter System 11 Cryogenics 12 Vacuum system 13 Beam Instrumentation 14 Control System 15 Machine Interlock System 16 Injection System 17 Beam Dumping System 18 Beam Cleaning and Collimation System 19 Interface with and Requirements from the Experiments 20 Parameters, Commissioning and Operation 21 The LHC as a Lead Ion Collider LHC Design Report Volume II The LHC Infrastructure and General Services 1 Introduction 2 The Site, Buildings and Underground Structures 3 Safety Issues 4 Radiation Protection and Shielding 5 Access Systems 6 Communication Networks 7 Power Distribution, Signal Cabling and Optical Fibre Installation 8 Cooling and Ventilation 9 Integration and Overall Machine Equipment Layout 10 Experimental Areas 11 The Alignment of LHC Components 12 Logistics and Installation 13 Monitoring and Operation of General Services LHC Design Report Volume III The LHC Injector Chain Part 1 The Proton Pre-Injectors 1 Introduction 2 Beam Requirements & Fundamental Choices 3 Proton Linac for LHC Injection 4 Upgrading the PSB to 1.4 GeV - Power Supplies 5 Booster Energy Upgrade to 1.4 GeV - Other Systems 6 Booster RF Systems 7 Bunch Splitting and Bunch Rotation in the PS 8 New PS RF Cavities 9 Transverse Emittance Conservation and Measurement 10 Performance of the Pre-Injector Complex Part 2 The SPS as LHC Injector 11 Introduction 12 Beam Parameters and Requirements 13 The SPS Injection Channel 14 The SPS Damper 15 Preservation of the Transverse Emittance 16 RF System and Longitudinal Beam Dynamics 17 Machine Impedance Issues 18 Extraction towards the LHC 19 Beam Instrumentation 20 The Internal Beam Dumping System Part 3 The LHC Transfer Lines 21 Introduction 22 Transfer Line Optics and Layout 23 General Services 24 Transfer Line Magnets 25 Transfer Line Powering 26 Beam Instrumentation 27 Transfer Line Dumps, Safety Stoppers and Collimators 28 Vacuum System for LHC Transfer Lines TI 2 and TI 8 29 Access and Safety 30 Integration and Installation 31 Commissioning Part 4 The LHC Ion Injector Chain 32 Introduction 33 Beam Request and Overview 34 Source and Linac 3 35 LEIR 36 Linac3-LEIR-PS Transfer Lines 37 PS and Transfer Line to SPS 38 SPS
Part 2 The SPS as LHC Injector
Part 3 The LHC Transfer Lines